| BYCO |
|
- Construction of 3.5 - 4 Km 28" dia Onshore Pipeline from Khalifa Point to Inside Of BPL Plant Tie-In Point.
|
|
| |
| BP PAKISTAN |
|
- Miscellaneous Projects involving construction of oil & gas pipeline, wellhead assemblies, Horizontal Directional Drilling (HDD), Thrust Bore Crossings and allied civil works etc.
|
|
| |
| TOTAL PARCO |
- Extension of Filling Point Gantry at Machike Oil Depot.
|
| |
| |
| PAKISTAN PETROLEUM LTD. |
- Welding / Construction / Laying of 20-Inch Dia Line Pipe to Replace 20 - Km Long Corroded Section of Existing Pipeline at Two Different Locations
|
| |
| TOBISHIMA CORPORATION |
- Project for Improvement of Water Supply System in Faisalabad.
|