| |
Area of Activities |
| |
| |
Installation
of High-Pressure Cross Country Oil, Gas and Water
pipelines, Pumping and Compressor Stations. |
| |
Construction
and Fabrication of Steel Storage Tanks. |
| |
Installation
of large diameter ductile / steel, water and sewerage
pipelines |
| |
Thrust
bore & Horizontal Directional Drilling Crossings.
|
| |
Installation
of Lifts, Escalators, Overhead Traveling Cranes
& Standby Generating sets. |
| |
Fabrication
of steel Structures, Cyclones, Ducts, Vessels,
Stacks Trusses and Walkways etc. |
|
|
|
| |
Current Projects |
| |
| |
BYCO |
| |
Construction
of 3.5 - 4 Km 28” dia Onshore Pipeline from Khalifa
Point to Inside Of BPL Plant Tie-In Point. |
| |
BP
Pakistan |
| |
Miscellaneous
Projects involving construction of oil & gas pipeline,
wellhead assemblies, Horizontal Directional Drilling
(HDD), Thrust Bore Crossings and allied civil
works etc. |
. |
Tobishima
corp |
| |
Project
for Improvement of Water Supply System in Faisalabad. |
|
|
|
|
Petrocon
(Pvt) Ltd. Petrocon established
in April 1979 and since then have executed more than
100 projects. Petrocon specialize in the construction
of High Pressure Cross Country Gas, Oil and Water Pipelines,
Erection and Installation of Heavy Equipment Designed
for the Refineries, Cement Plants, Gas and Oil Compressor
or Pumping Stations and other Chemical Plants to name
only the few. Petrocon has successfully completed Projects
on Turn-Key basis requiring detailed Engineering Design,
Procurement of Foreign and Local materials, their installation
and commissioning and subsequently On-Site training
of the Clients Personnel. Petrocon (Pvt) Ltd has completed
Projects in almost all major fields such as Civil, Electrical
and Mechanical.
Petrocon (Pvt) Ltd. has their own Workshop/Warehouse facilities spread over six acres and owned by the Company. Major Overhauling, Repair and Maintenance of the Heavy Equipment and machinery is done in this Workshop. This Workshop is also equipped with Fabrication Shops capable of manufacturing components / parts not only those required for our own projects but also for sale in the open market.
Petrocon
have always lived up-to our Motto “CONFIDENT
TO BUILD WITH COMMITMENT”, as our pride
is that during the last 31 YEARS, not a single project
had been left incomplete involving Litigation or Liquidated
Damages; our Pride is that we have been on many a Project
compensated for delays due to the owner’s constraints;
our Pride is that Petrocon
have earned Bonuses wherever allowed by the Contract
for ahead of schedule completion of the project; our
Pride is that we have never been black-listed by any
Company and that Petrocon
have never been refused pre-qualification from any Company
that matters.
Petrocon (Pvt) Ltd. is safety and QA/QC conscious company and always emphasis on following:-
• Safety First
• Achieve Zero Tolerance
• Deliver the Goods in time |
|