Petrocon Logo Logo
  ENGINEERS, FABRICATORS & ERECTORS
   
   
 
LIST OF MAJOR EXECUTED PROJECTS
 
 
   
   
   
 
S. # CLIENT TITLE OF PROJECT LOGO
Mechanical Works
 
Total Parco Pakistan Ltd.
Extension of Filling Point Gantry at Machike Oil Depot.
 
Byco Petroleum Pakistan Ltd.
Construction of Mechanical Works for Fuel Gas & Desalter Relief System.
1.
Orient Energy Systems
Mechanical and piping works of 90 MW (3 x 32 MW) Genset Gas Power Plant for K.E.S.C.L, Korangi Karachi on fast track basis. The job also includes procurement of pipe, valves, fittings and ducting material etc.
2.
Total Atlas Lubricants
Mechanical, Electrical & Instrumentation works of Lubricant Oil Blending plant including Tank Fabrication, Piping network Fire Fighting, insulation and complete Electrification & Instrumentation work with supply of material, testing & Commissioning at Port Qasim Karachi for Total Atlas Lubricant Pakistan (Pvt) Ltd.
3.
Total Parco
Construction of Bulk Oil Depot at Machike for Total Parco Comprising of Civil Works, Building, Area Development, Foundation, Storage Tanks, Loading Gentry, Transfer Pump, Fire Fighting System, Product Transfer Pipeline complete with electrical & Instrumentation work including testing and commissioning.

4.
Pakistan Power Resource
Complete mechanical erection of 136 MW Gas Turbine Power Plant Project at Bhikki, District Sheikhupura comprising of unloading and erection of gas turbine and generators with auxiliary equipment weighing single unit of 75 tons with allied equipment like gas / air compressors, pumps, piping (water, air , gas & fire water) instruments with supply, fabrication and erection of pipe racks, stack, steel structure, shed, storage tanks for fire water / raw water including sand blasting, painting and insulation, complete with testing and commissioning as sub-contractor of TIC International, USA for PPR a joint venture company of Associated Group Pakistan and Walter Power USA.

5.
DW&CE (NAVY)
Provision & construction of Fuel Storage facility for Marine Diesel Oil (MDO) and Jet Petroleum (JP-5) with capacity of 5,000,000 liters for MDO & 500,000 liters for JP-5, including loading arms, bulk fuel meters, pre-filters, coalescers and pre-coat filtration system with about 7,000 meters laying of pipeline ranging from 25mm dia to 250mm dia, including pipe coating & epoxy painting of storage tanks, cathodic protection and complete fire fighting system, allied civil and electrical works with instrumentation and automation.

6.
WAPDA/ DEC
Supply, fabrication and installation of 1.2M and 0.6M diameters, 344M & 144 Meter long, M.S. seam welded pipe conforming to ASTM A53 grade “B” for South & North Pond Lower Level Outlet structure at Ghazi Barotha Hydro Power Complex for Dongfang Electric Corporation. The scope of work includes rolling and fabrication of pipe from 12.7mm thick M.S. plate in the workshop established at site, including sand blasting, epoxy painting to specified thickness internally / externally.

7.
DSF
Erection, Installation & Commissioning work of Chemical & Textile Plant at Dewan Salman Fiber Ltd, Hattar Industrial Estate, Haripur. The work included fabrication, electric & argon welding for C.S. pipes, fabrication / erection of Steel Structure and Pipe Supports, installation of Carbon Steel & Stainless Steel Piping Testing & Commissioning.

8.
BCL

Mechanical Erection (about 4500 tons) of 3300 Ton Per Day Bestway Cement Plant at Hattar, involving Erection of Raw Mills, Cement Mills, Silos, Conveyors, Filters, Electrostatic Precipitators, Compressors, Utility piping systems & allied works and fabrication of Misc. components including rectification of mismatching parts.

9.
DEC
Supply & Fabrication of 600 Tons of steel structure, like trusses, columns etc. for belt conveyors at Hydle Power Complex Ghazi Barotha with Dongfang Electric Corporation.

10.
HMC

Fabrication of about 900 tons of Components / structure like Pedestal Supports, Cyclones, Tanks, Coolers, Ducts, E.P’s., Structure, Vessels and allied items for 3300 TPD capacity Bestway Cement Plant at Hattar.

SSGC Logo
11.
WAPDA
Erection of cooling tower system complete with Civil works, inlet/outlet piping at Quetta Thermal Power Plant.

12.
State Cement Corporation of Pakistan
Erection and installation of 1000 Tons per day capacity Kohat Cement Factory, involving fabrication of heavy steel structures, erection of Crusher, Stacker, Reclaimer Raw and Cement Mills, Preheater, Kiln, Cooler, Conveyors Packing Plants, Oil storage tanks, Boilers, Compressors, and allied piping works Electrostatic Precipitators, ducting, refractory bricks lining and insulation works testing, complete plant.

 
13.
PARCO
Construction of oil pumping stations of Karachi Mehmood Kot PARCO oil pipeline project at Korangi PS-1 and Shikarpur PS-3 including installation of pumping units, metering systems, high pressure pipelines from 12.5mm dia to 800mm dia, coating, wrapping, pickling, sand blasting, complete fire fighting systems, foamskid, motor operated valves with electrification complete automation, testing and commissioning.

 
Copyright 2009 - All rights Reserved
Designed & powered by Sibex Systems
 
  Home l Projects l Our Vision l QHSE Policy l Clients l Contact Us