LIST OF MAJOR EXECUTED PROJECTS
 
   
   
 
   
 
 
       
 
S. # CLIENT TITLE OF PROJECT LOGO
Water Supply Pipelines
1. Pakistan Petroleum Ltd. Welding / Construction / Laying of 20-Inch Dia Line Pipe to Replace 20 - Km Long Corroded Section of Existing Pipeline at Two Different Locations
2.
Taisei, Japan
Installation of 800 mm 3.6 km Ductile Iron pipe water supply pipeline in congested Faisalabad city including allied civil works, re-instatement of roads, crossing of railway & canals by Thrust Bore method for FDA / WASA.
3.
DW&CE (Navy)
Provision and Laying of Fire Main Pipeline Network at PN Dockyard Karachi, Including supply of 80mm-200mm dia D.I pipes fitting, valve, Hydrant, Construction of RCC pipe duct, valve chamber, testing & commissioning.  
4.
PPL
Excavation of hard rock required for storm water channel at Sui Gas Field with hydraulic rock breakers UH. 04SS (blasting prohibited) in open area and pneumatic rock breakers with compressors in the limited / obstructed areas.
5.
CDA
 Supply, Manufacturing/Fabrication of M.S pipe of 1830mm dia X 20mm dia WT. and 1420mm dia X 16mm WT. Used for casing pipe under railway crossing for passing water line by TAISEI Corporation of JAPAN.
6.
PPL
Laying of 4” dia, 22 Kms, high pressure welded pipeline conforming to API 1104 specification from Kashmore to Mazari Goth including supply of required coating materials.
7.
PPL
Laying of 20” dia, 32 Kms High pressure welded pipeline conforming to API 1104 specification for Sui Gas field water supply extension project from Khewali Pump Station Kashmore including external coating / wrapping, Pig Launcher / Receiver Assemblies Testing and Commissioning.
8.
WAPDA
Laying of 30” dia 15 Kms, make-up water pipeline for unit 5 & 6 of Extension project phase II Thermal Power Plant Muzaffargarh, including supply of valves fittings, coat and warp material etc.
9.
WAPDA
Laying of 38 Kms of 300mm to 750mm dia mild steel welded water supply pipeline including coating and wrapping testing and commissioning from tube wells situated along bank of River Chenab to Thermal Power Plant at Muzaffargarh.
10.
HDA
Laying of 300mm to 1000mm dia 30 Kms in length Ductile iron water supply pipeline network in city of Hyderabad involving extensive dewatering and control blasting for rock excavation.
11.
CDA
Manufacturing and installation of mild steel welded water supply pipeline of 30” and 36” dia to complete the left-over segment of bulk water supply main from Simly Dam to Islamabad.
12.
WASA / LDA
Laying of 200mm to 800mm dia 47Kms Ductile iron water supply pipeline main grid including connection with existing system and tubewell in the busy city of Lahore.
 
 