Civil and Mechanical construction work of Gasoline Production Project at Enar Petroleum Refining Facilities (EPRF-II), Karachi as Sub- Contractor of Shandong Hi-Speed Kerui Petroleum Equipment Co. Ltd. Project Comprising of Following Major activities. · Earth Work. 30,000 Cu.M · Concrete work for Foundation 10,500 Cu.M · Steel reinforcement 9 00 Ton · Building Works 7500 Sq.M · Steel Structure Fabrication and Erection 2250 Ton · Piping Network 150,000 inch dia · Equipment Erection 3000 Ton Job also include infrastructure of work like drainage system, area development, Pavement / Road Work, Epoxy / Painting, Insulation, Testing and Commissioning assistance to vendor for commissioning and trial run of Refinery.