Construction of 28 Inch N.D. x 4 Km Onshore Pipeline from Khalifa Point to Inside Of Byco Plant TieIn Point including preparation of ROW, transportation of pipe, stringing, welding, trenching, coating of welded joints by heat shrinkable sleeves, lowering, backfilling, road crossings of 32 Inch N.D. casing pipe, C.P. system, hydrostatic testing, de-watering and commissioning as per specifications.